      Charge point operators (CPOs) grow their networks one site at a time, and each new site raises the same questions: will drivers use it, can the grid connection support it, and how soon can it earn revenue? Mobile energy storage charging stations let a CPO answer those questions with real charging sessions instead of forecasts. MPMC, a Shanghai-based manufacturer, supplies its BCH Series mobile BESS chargers to operators who want to open locations quickly and move capacity to where demand proves strongest.

      Four Ways BCH Units Support Network Growth

      Testing a New Location

      A BCH unit reaches full operation within 24 hours with no grid construction. The CPO opens a site, records every session through OCPP 1.6, and then decides with confidence whether to build permanent infrastructure, keep the mobile unit in place or move it to a stronger location. The same unit can test several locations in a single year.

      Opening Before the Grid Upgrade

      Battery buffering lets a modest connection support high-power charging. The BCH-275-200 draws 80 kW of AC input and delivers 150 kW of DC charging, while the BCH-600-400 and BCH-800-600 draw 280 kW and deliver 400 kW and 600 kW. Sites can therefore open and earn revenue while larger connections are planned.

      Meeting Seasonal and Event Peaks

      Holiday routes, festivals and sports venues create demand for a few weeks a year. Mobile units move to those locations for the busy period and return to other sites afterwards, so the network’s assets stay productive across the year.

      Supporting Existing Sites

      Busy hubs can add a mobile unit alongside fixed chargers to absorb extra demand, or keep a location charging while fixed equipment is upgraded or serviced.

      Table 1. Network expansion scenarios and the BCH approach

      Scenario

      BCH approach

      Benefit for the CPO

      New location test

      Unit deployed within 24 hours; sessions logged via OCPP 1.6

      Investment based on real usage

      Grid upgrade pending

      Battery buffering: 80-280 kW AC input, 150-600 kW DC output

      Revenue before construction ends

      Seasonal or event peaks

      Units relocated to busy sites for the season

      Assets productive all year

      Busy or upgrading hubs

      Mobile unit added beside fixed chargers

      Continuous service for drivers

      MPMC BCH-500-1000 containerised mobile BESS charger providing outdoor fast charging for electric vehicles.

      Built Into the CPO’s Platform

      Every BCH charging model runs an EMS with 4G connectivity, OCPP 1.6 and an open cloud-ready API, so units appear in the CPO’s charge point management and billing systems like any other charger, with optional RFID payment. Output of 50 to 1,000 V on the BCH-275-200 and larger models serves both 400 V and 800 V vehicles, CCS2 guns are standard, and CCS1, GB/T and CHAdeMO can be specified for specific markets.

      Table 2. BCH models for public charging networks

      Model

      DC output

      Storage

      AC input

      Network role

      BCH-80-70

      80 kW, 1 × CCS2 260 A

      70 kWh

      DC input, 70 kW

      Compact sites; car parks

      BCH-275-200

      150 kW, 2 × CCS2 250 A

      203.5 kWh

      80 kW

      New locations; trailer-mounted

      BCH-600-400

      400 kW, 2 × CCS2 350 A

      407 kWh

      280 kW

      Busy hubs; trucks and cars

      BCH-800-600

      600 kW (640 kW peak)

      610.6 kWh

      280 kW

      High-turnover sites

      BCH-500-1000

      500 kW (560 kW peak)

      1,075 kWh

      560 kW

      Solar-storage and corridor hubs

      Note: The table lists the DC charging models; the BCH Series also includes the BCH-60-70, an AC-output unit.

      From Mobile Site to Solar-Storage Station

      Some sites become permanent in a different form. In the Netherlands, a 500 kW / 1,000 kWh BCH unit powers a 1 MWh grid-connected solar-storage EV charging station, turning zero-cost solar energy into charging revenue. MPMC positions the BCH Series for locations where drivers value immediate access to charging, which supports stronger pricing, and integrated SCADA and EMS keep staffing needs low across dispersed sites.

      Charging cabinet inside an MPMC BCH-500-1000 containerised mobile BESS charger.

      Why CPOs Choose MPMC

      MPMC builds BCH units in its own Jiangsu factories with blade LFP battery packs rated for 6,000 cycles at 90% depth of discharge. The BCH-275-200 and larger models carry a 3-year system warranty and a 5-year battery performance warranty, and BCH units already serve logistics, port and solar-storage sites in the UK, the Netherlands, Norway and Sweden. Warranties transfer if units are resold within the warranty period, which protects the value of assets that move around a network.

      Expanding a Charging Network With MPMC

      • Shortlist locations to test and the vehicles they serve

      • Record grid capacity and upgrade timelines at each site

      • Choose BCH models by expected demand and power

      • Connect units to the CPO platform through OCPP 1.6

      • Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a network expansion proposal

      https://www.mpmc-group.com/
      MPMC Powertech Corp.

    Viewing 1 post (of 1 total)
    • You must be logged in to reply to this topic.