      Warehouses, distribution centres, ports and factories are moving their forklift fleets to electric power, and charging adds load to buildings whose connections were sized for an earlier era. A mobile energy storage charging station stores energy during quiet hours and supplies forklift chargers and electric vehicles when shifts change, so sites can grow their fleets without waiting for a grid upgrade. MPMC, a Shanghai-based manufacturer of BCH mobile BESS chargers with references across Europe, supplies three ways to do this.

      Three Ways to Charge Forklifts With BCH Units

      Socket Power for Forklift Chargers

      Most forklifts charge through their own chargers, so the BCH unit’s AC output does the work. The BCH-60-70 stores 70 kWh and provides 30 kW of AC output, or 60 kW as an option, through a 63 A three-phase socket, two 32 A single-phase sockets and a 10 A socket, in a 900 kg unit measuring 1,550 × 830 × 1,300 mm that operates from -20°C to +55°C. The BCH-275-200 adds 125 kW of AC output through 125 A and 16 A CEE sockets, and the BCH-600-400 provides 200 kW through 125 A, 63 A, 32 A and three 16 A CEE sockets.

      DC Fast Charging for Compatible Vehicles

      Electric shuttles, vans and site vehicles with CCS2 inlets charge directly from the BCH unit’s DC guns: 80 kW on the BCH-80-70, 150 kW on the BCH-275-200 and 400 kW on the BCH-600-400. Charging guns support simultaneous charge and discharge.

      Peak Shifting for the Whole Site

      Many electric forklifts charge during breaks and at shift changes, which concentrates demand into short windows. Units recharge overnight or from rooftop solar and discharge at shift changes, when many forklifts plug in at once, which keeps the building’s peak draw within its connection and can reduce demand charges. The BCH-275-200 takes solar through a 63 A CEE socket and the BCH-600-400 through a 400 A PowerLock connection.

      Table 1. BCH models for electric forklift fleets

      Model

      AC output

      AC sockets

      DC output

      Storage

      BCH-60-70

      30 kW (60 kW option)

      63 A 3P; 2 × 32 A 1P; 10 A

      –

      70 kWh

      BCH-275-200

      125 kW

      125 A and 16 A CEE

      150 kW, 2 × CCS2

      203.5 kWh

      BCH-600-400

      200 kW

      125 A, 63 A, 32 A, 3 × 16 A CEE

      400 kW, 2 × CCS2

      407 kWh

      Note: The table shows selected models; the BCH Series also includes the BCH-80-70, BCH-800-600 and BCH-500-1000.

      MPMC BCH-275-200 mobile BESS chargers ready for indoor and yard deployment.

      Where BCH Units Fit

      Table 2. BCH configurations by site type

      Site

      Typical vehicles

      Suggested configuration

      Warehouse or distribution centre

      Forklifts, reach trucks, tow tractors

      BCH-60-70 or BCH-275-200 feeding forklift chargers

      Port or logistics yard

      Forklifts, yard tractors, vans

      BCH-275-200 or BCH-600-400 with AC and DC output

      Factory or industrial park

      Forklifts, shuttles, maintenance vehicles

      BCH-275-200 or BCH-600-400 with solar input

      Why Sites Choose MPMC as Their Supplier

      Every BCH unit reaches full operation within 24 hours, so new charging capacity arrives far faster than a grid upgrade, and units can move between buildings as layouts change; the BCH-275-200 even includes an integrated forklift pocket for repositioning. Blade LFP battery packs with precision temperature control give 6,000 cycles at 90% depth of discharge, and the EMS with 4G connectivity allows remote monitoring and management. Larger models carry aerosol fire protection and C4 anti-corrosion coating, and sites with seasonal peaks can also hire units through rental partners. Because each unit is mobile, a site can start with one BCH for its busiest building and add more as forklift numbers grow, with OCPP 1.6 support on the BCH-80-70 and larger models for integration with site systems.

      MPMC BCH-600-400 mobile BESS charger with 200 kW of AC output for site loads.

      MPMC manufactures BCH units in its own Jiangsu factories, including the Yangzhong energy technology base with its automated battery pack and BESS assembly lines, and supports customers with remote diagnostics and on-site commissioning. BCH units are already working across Europe, from a logistics port in the UK and port operations in the Netherlands to rental fleets in Sweden, and the BCH-275-200 and larger models carry a 3-year system warranty and a 5-year battery performance warranty.

      Planning Forklift Charging With MPMC

      • Count forklifts and note their charger ratings

      • Identify when most vehicles charge during the day

      • Check the building’s available connection

      • Consider rooftop solar as an energy source

      • Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a forklift charging proposal